NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges.
*Scheduled closures are subject to change based on weather conditions and other factors.*
For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.
Bridges & Tunnels:
Hampton Roads Bridge-Tunnel, I-64:
- Single-lane closures eastbound April 26 and April 28 from 9 p.m. to 5 a.m.
- Single-lane closures westbound April 25-27 from 9 p.m. to 5 a.m.
Monitor-Merrimac Memorial Bridge-Tunnel, I-664:
- Single-lane closure southbound April 27 from 9 p.m. to 5 a.m.
James River Bridge, Route 17:
- Alternating, single-lane closures from 9 a.m. to 5 p.m.:
- Both directions April 24-26 and April 28-29
- Northbound April 27
George P. Coleman Bridge, Route 17:
- Alternating, mobile, single-lane closures in both directions April 26-29 from 9 a.m. to 3 p.m.
High Rise Bridge, I-64:
- Single-lane closure eastbound April 28 from 9 p.m. to 5 a.m.
Berkley Bridge, I-264:
- Single-lane closure westbound April 24 from 9 p.m. to 5 a.m.
HRBT Expansion Project:
-
For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org.
Elizabeth River Tunnels (Downtown/Midtown Tunnels):
-
Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).
|