SHARE:  
RELEASE: IMMEDIATE
CONTACT:
Media Line: 757-956-3032

April 22, 2022

HAMPTON ROADS CLOSURES ON WATER CROSSINGS, INTERSTATES AND OTHER NOTABLE DETOURS

For the week of April 24-30

 NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges.


*Scheduled closures are subject to change based on weather conditions and other factors.*


For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.


Bridges & Tunnels:


Hampton Roads Bridge-Tunnel, I-64:

  • Single-lane closures eastbound April 26 and April 28 from 9 p.m. to 5 a.m.
  • Single-lane closures westbound April 25-27 from 9 p.m. to 5 a.m.


Monitor-Merrimac Memorial Bridge-Tunnel, I-664:

  • Single-lane closure southbound April 27 from 9 p.m. to 5 a.m.


James River Bridge, Route 17:

  • Alternating, single-lane closures from 9 a.m. to 5 p.m.:
  • Both directions April 24-26 and April 28-29
  • Northbound April 27


George P. Coleman Bridge, Route 17:

  • Alternating, mobile, single-lane closures in both directions April 26-29 from 9 a.m. to 3 p.m.


High Rise Bridge, I-64:

  • Single-lane closure eastbound April 28 from 9 p.m. to 5 a.m.

 

Berkley Bridge, I-264:

  • Single-lane closure westbound April 24 from 9 p.m. to 5 a.m.


HRBT Expansion Project:

  • For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org. 


Elizabeth River Tunnels (Downtown/Midtown Tunnels): 

  • Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).

I-64, Express Lanes:

  • Full closure in both directions:
  • Consecutive closure April 22 at 11 p.m. through April 24 at 6 p.m.
  • April 24-28 from 8 p.m. to 5 a.m.
  • April 25 from 9:30 am. to 12:30 p.m.
  • Consecutive closure April 30 at 10 a.m. through May 1 at 6 p.m.


I-64, Southside Widening, High Rise Bridge Expansion:

  • For a full list of ongoing traffic impacts and lane closures, visit the project traffic alerts page: 64highrise.org/news_and_traffic_alerts/lane_closures.asp
  • Full closure of I-64 in both directions between I-464 and George Washington Highway, to include the High Rise Bridge, on April 25 as early as 11 p.m. through 4 a.m. 
  • Full nightly closure of the George Washington Highway (Route 17) north on-ramp to I-64 west through April 26, from 9 p.m. to 5 a.m. 
  • Full closure of the off-ramp from I-64 west to Great Bridge Boulevard (Exit 292) on April 23 and April 28, from 7 p.m. to 5 a.m. 
  • Alternating, single-lane closures in both directions on I-64 between I-664 north/Route 13/Route 58 (exit 299) and Shell Road (overpass), April 24 to May 1, from 7 p.m. to 5 a.m.
  • For more information about the above traffic impacts, click here: https://conta.cc/36IzDv2

I-64 / I-264 Interchange Improvements Project, Norfolk/Virginia Beach:

  • New traffic pattern in place with the opening of a new off-ramp from I-264 east to northbound Newtown Road (exit 15B). Click here for the full traffic alert: https://conta.cc/3IZCvSd
  •  Alternating, multi-lane closures on I-264 in both directions from Newtown Road (exit 15) to Witchduck Road (exit 16) April 24-30 from 7 p.m. until as late as 10 a.m.
  • Alternating, single-lane closures on the ramp from I-64 west to I-264 east (exit 284B) April 24-30 from 7 p.m. to 5 a.m.
  • Alternating, double-lane closures on I-264 west from Witchduck Road (exit 16) to Newtown Road (exit 15) on April 22 at 9 p.m. to April 25 at 5 a.m. and on April 29 at 9 p.m. to May 2 at 5 a.m.
  • Ongoing single-lane closure on southbound Newtown Road at Center Drive, including a closure of the right-turn lane into Center Drive, in place through April 23 at 7 p.m. Click here for the full traffic alert: https://conta.cc/3K5BtDV

I-564, Norfolk:

  • Consecutive, double-lane closures on I-564 east in both directions between the runway tunnel and Terminal Boulevard:
  • April 22 at 7 p.m. through April 25 as late as 5 a.m. 
  • April 29 at 7 p.m. through May 2 as late as 5 a.m. 
  • Full closure of the on-ramp from Gate 3A (Bainbridge Avenue) to I-564 east April 27-28 from 7 p.m. to 5 a.m. with a signed detour in place, and a full consecutive closure April 29 from 7 p.m. to May 2 at 4 a.m.

Other Notable Closures:


Laskin Road, Virginia Beach:

  • Portion of Fremac Drive closed at Laskin Road has reopened to traffic.
  • Single-lane closures and turn restrictions under flagger control at the intersection of First Colonial Road and Republic Road as early as Sunday, April 24, at 6 a.m. through Monday, April 25, at 6 a.m. Click here for the full traffic alert: https://conta.cc/3OeFclx


Route 460, Isle of Wight County:

  • Continuous, single-lane at reduced-width on Route 460 (Windsor Boulevard/General Mahone Boulevard) in both directions over Blackwater River between Zuni Circle and Tucker Swamp Road (Route 635). Wide loads exceeding 10 feet 6 inches are advised to use alternate routes. Click here for the full traffic alert: https://conta.cc/3pDNhWu
Facebook  Twitter  Instagram