Track Work on Q Train This Weekend
Please be advised that MTA NYC Transit has scheduled the renewal of mainline track on the Brighton Line, between the Ocean Pkwy & Brighton Beach Stations.
This project is scheduled for (1) weekend, commencing Friday, August 9th, 2024, and ending Sunday, August 11th, 2024. Scheduled working hours will be as follows: 6:00 am - 4:00 pm on Friday for preparatory work which consists of, but not limited to the staging of Street Cranes, Track Panels and related materials at the Crane sites listed below, and 5:00 am-9:00 pm on Saturday & Sunday for track removal and installation.
NYCT will have a maximum of (2) Cranes placed adjacent to the elevated structure for the purpose of hoisting and lowering of track panels and materials at the location listed below. Actual road closure locations will be determined by the section of track being replaced.
NYCDOT approved flagging and traffic devices will be utilized for the safety of the public. Parking will not be allowed on Brighton Beach Ave, between Brighton 1st Street & Brighton 4th St to allow traffic diversions, and to maintain (1) Lane open at all times. Parking will also be restricted for 150’ ft. along each curb lane at each Crane location to allow the placement of a Crane and materials.
Crane Locations & Potential Road Closures:
Brighton 2nd St, between Brighton Beach & Ocean View
Brighton 1st Pl, between Brighton Beach & Brighton 1st St
3. Brighton 1st St, between Brighton Beach & Brighton 1st Pl
Brighton Beach Traffic Impact:
Eastbound: Will remain normal.