495logo.jpg

495 NEXT Project

Lane Closures and Traffic Changes

April 3 - 8, 2023

The following construction-related lane closures and traffic changes are planned to occur in the I-495 Express Lanes Northern Extension (495 NEXT) project corridor. Travelers should expect potential delays when traveling in this area, and are encouraged to visit 511virginia.org for current information on travel conditions and work zones in Virginia. All construction-related work and closures are subject to change based on weather and other factors.

Upcoming Highlights

  • Daytime and nighttime single lane closures on I-495 North and South
  • Nighttime multi-lane closures on I-495 North and South, including triple left lane closures throughout the project corridor
  • Daytime and nighttime single lane closures on Georgetown Pike
  • Daytime flagging operations on Live Oak Drive and Lewinsville Road

Lane Closures 

I-495 (CAPITAL BELTWAY)


I-495 North


Monday, April 3, through Thursday, April 6, 10 a.m. to 3 p.m.

Single right lane closures on northbound I-495 between the Dulles Corridor interchange and George Washington Memorial Parkway for sound wall demo, tree clearing, and excavation work.


Monday, April 3, through Thursday, April 6, 10 p.m. to 5 a.m. and Friday, April 7, 11 p.m. to 7 a.m. 

Triple left lane closures on northbound I-495 throughout the project corridor for joint repair work. Note: this work is scheduled to take place nightly through the spring as weather conditions allow.  


Monday, April 3, through Thursday, April 6, 10 a.m. to 3 p.m. and 9:30 p.m. to 5 a.m., and Friday, April 7, 10 a.m. to 12 p.m. and 10 p.m. to 8 a.m.

Alternating mobile single lane closures on northbound I-495 throughout the project corridor as needed for traffic management.


I-495 South


Monday, April 3, through Thursday, April 6, 9:30 a.m. to 2:30 p.m.

Single right lane closures on southbound I-495 between the Dulles Corridor interchange and George Washington Memorial Parkway for sound wall demo, tree clearing, and excavation work.


Monday, April 3, through Thursday, April 6, 9:30 p.m. to 5 a.m., Friday, April 7, 11 p.m. to 7 a.m. and Saturday, April 8, 11 p.m. to 8 a.m. 

Triple left lane closures on southbound I-495 throughout the project corridor for joint repair work. Note: this work is scheduled to take place nightly through the spring as weather conditions allow.  


Monday, April 3, through Friday, April 7, 9:30 p.m. to 5 a.m.

Single right lane closure on the southbound I-495 exit lanes to George Washington Memorial Parkway (Exit 43) and Georgetown Pike (Exit 44) for barrier placement for jack and bore work.


Monday, April 3, through Thursday, April 6, 9:30 a.m. to 2:30 p.m. and 9:30 p.m. to 5 a.m., and Friday, April 7, 9:30 am. to 12 p.m. and 10 p.m. to 8 a.m. 

Alternating mobile single lane closures on southbound I-495 throughout the project corridor as needed for traffic management.

LIVE OAK DRIVE


Monday, April 3, through Thursday, April 6, 9 a.m. to 3:30 p.m. and Friday, April 7, 9 a.m. to 2 p.m. 

Live Oak Drive will be reduced to a single lane to accommodate temporary drainage and paving grading work. Flagging operations alternating single traffic lanes will be in effect.

GEORGETOWN PIKE INTERCHANGE 


Monday, April 3, through Friday, April 7, 9:30 a.m. to 3 p.m.

The left turn lane on eastbound Georgetown Pike to northbound I-495 will be closed for bridge work. The onramp from Georgetown Pike to northbound I-495 also will be narrowed at this time.


Monday, April 3, through Friday, April 7, 9 a.m. to 3:30 p.m.

The right lane and turn lane on westbound Georgetown Pike will be closed for bridge work.


Monday, April 3, through Thursday, April 6, 10 p.m. to 5 a.m. and Friday, April 7, 10 p.m. to 9 a.m. 

Alternating single lane closures on east- and westbound Georgetown Pike for temporary striping work.

LEWINSVILLE ROAD


Monday, April 3, through Thursday, April 6, 9:30 a.m. to 3 p.m. and Friday, April 7, 9:30 a.m. to 2 p.m. 

Lewinsville Road will be reduced to a single lane to accommodate sidewalk replacement work. Flagging operations alternating single traffic lanes will be in effect on the Lewinsville Road bridge over I-495.

DULLES CORRIDOR INTERCHANGE 


Dulles Toll Road


Wednesday, April 5, 9:30 a.m. to 3 p.m.

Right shoulder closure on westbound Dulles Toll Road (267 Connector) between Route 123 and the I-495 interchange for soil sampling for overhead sign work.

Traffic Changes

I-495 South Overnight Triple Lane Closures


Reminder: Nightly triple lane closures began March 6 on southbound I-495 for joint repair work. These overnight closures will continue through spring as weather conditions allow. Closures began near the American Legion Bridge and will progress south on the approximately 2.5-mile 495 NEXT project corridor. At least one lane will remain open to traffic at all times. most of this work and related overnight closures will occur on weeknights, though some will occur during weekend overnights. Learn more about the traffic change here.

New Exit Ramp for I-495 North Exit to Dulles Toll Road


Reminder: Motorists traveling on northbound I-495 heading for westbound Dulles Toll Road must take a new, earlier exit. The new exit ramp is located about one-third of a mile ahead of the old, closed Exit 45. To facilitate this new traffic pattern, I-495 has been reduced from four to three lanes for approximately one-half mile near the Dulles Corridor interchange. Learn more about the traffic change here.

See the new traffic pattern here.

George Washington Memorial Parkway West at I-495


Reminder: The ramp from westbound George Washington Memorial Parkway to southbound I-495 (Capital Beltway) was reduced from two lanes to one lane to make room for a construction vehicle haul route that will be separated from traffic by a physical barrier. This traffic change will be in effect throughout construction on the 495 NEXT project. Learn more about the traffic change here.

Project Background

The I-495 Express Lanes Northern Extension (495 NEXT) project will extend the existing 495 Express Lanes north by two-and-a-half miles from the Dulles Corridor interchange to the George Washington Memorial Parkway interchange in the vicinity of the American Legion Bridge. The project will provide new and improved connections at the Dulles Corridor and George Washington Memorial Parkway.


Other project benefits include four miles of new bicycle and pedestrian connections including a shared-use path parallel to I-495 from Lewinsville Road to near Live Oak Drive, replacement or rehabilitation of seven bridges with pedestrian accommodations, replacement of nine existing noise walls and construction of a new noise wall, environmental improvements introducing stormwater management facilities and funding of restoration at Scotts Run stream, and dedicated funding to support transit improvements in the corridor including new bus service over the American Legion Bridge. 

 

495 NEXT is a public-private partnership project between the Commonwealth of Virginia and Transurban, operator of the existing 495 Express Lanes. Lane Construction is the design-build contractor for the project. The new extended lanes are scheduled to open in 2025. 

mainphoto1722.png

Learn More About the Project


Check out www.495NEXT.org for additional information.


Sign up to receive project email updates.



laptop_495EX website.png

Questions?

Email: 495NorthernExtension@vdot.virginia.gov

Call: Construction Inquiry Line, 703-592-6430

Virginia Department of Transportation, Michelle Holland, 703-586-0487

Transurban, Brent McKenzie, 571-326-5609

Lane Construction, John Undeland, 703-785-3461

Facebook  Instagram  Twitter  YouTube