I-495 (CAPITAL BELTWAY)
I-495 North
Monday, November 13, through Thursday, November 16, 10 a.m. to 3 p.m.
Single right lane closure on northbound I-495 between Lewinsville Road and George Washington Memorial Parkway for drainage, sound wall, embankment, and excavation work.
Monday, November 13, through Friday, November 17, 10 a.m. to 3 p.m. and 9:30 p.m. to 5 a.m.
Alternating single mobile lane closures on northbound I-495 throughout the project corridor as needed for maintenance work and traffic management.
Monday, November 13, through Friday, November 17, 9:30 p.m. to 5 a.m.
Single right lane closure on northbound I-495 between Lewinsville Road and the George Washington Memorial Parkway for the removal of drainage structures.
I-495 South
Monday, November 13, through Thursday, November 16, 9:30 a.m. to 2:30 p.m.
Single right lane closure on southbound I-495 between Georgetown Pike and Dulles Toll Road for drainage, excavation, embankment, and sound wall work.
Monday, November 13, Tuesday, through Thursday, November 16, 9:30 p.m. to 5 a.m.
Double right lane closures on southbound I-495 at the Scott's Run bridge for demolition work and overhead sign removal.
Monday, November 13, through Friday, November 17, 9:30 a.m. to 2:30 p.m. and 9:30 p.m. to 5 a.m.
Alternating single mobile lane closures on southbound I-495 throughout the project corridor as needed for maintenance work and traffic management.
Monday, November 13, through Friday, November 17, 9:30 a.m. to 2:30 p.m.
Single left lane closure on the ramp from southbound I-495 to Georgetown Pike for pile driving and excavation work.
|