CONSTRUCTION ACTIVITIES -
Week of October 4, 2021
BRIDGE WORK
The week of October 4, crews will continue work on the retaining walls along the EB SR 210 Base Line on-ramp, perform concrete pours on SR 210 at 5th Street, as well as slope paving work at Victoria Avenue and Pioneer Avenue, and continue constructing temporary bridge supports, also known as falsework, at Highland Avenue and Arden Avenue. The following nighttime closures of EB and WB SR 210 are needed to facilitate this work:

EB SR 210 Closed at Del Rosa Avenue - Closed nightly from 11:59 p.m. to 5:00 a.m., Monday, October 4 through Thursday, October 7 (into Friday morning).

DETOUR: Exit WB SR 210 at Highland Avenue and turn left at the end of the ramp, turn right on Arden Avenue, left on Lynwood Drive, and left on Del Rosa Avenue to reenter WB SR 210 via the on-ramp.

WB SR 210 Closed at Base Line - Closed overnight from 11:59 p.m. to 5:00 a.m., Monday, October 4 and Tuesday, October 5 (into Wednesday morning).

DETOUR: Exit WB SR 210 at 
Base Line and turn right at the end of the ramp. Turn left on Boulder Avenue, right on Highland Avenue, and right on SB 330 on-ramp to reenter WB SR 210.

WB SR 210 Closed at Highland Avenue - Closed overnight from 11:59 p.m. to 5:00 a.m., Wednesday, October 6 and Thursday, October 7 (into Friday morning).

DETOUR: Exit WB SR 210 at Highland Avenue and turn left at the end of the ramp, turn right on Arden Avenue, left on Lynwood Drive, and left on Del Rosa Avenue to reenter WB SR 210 via the on-ramp.
Bridge widening activities are underway during daytime and nighttime shifts, at numerous locations throughout the project area, including 5th Street, Pioneer Avenue, Victoria Avenue, Base Line Interchange, and Highland Avenue. Visit the Google map above (project Google map) for the most up-to-date closures scheduled and available detour routes.
SR 210 LANE, CONNECTOR, AND RAMP CLOSURES
Connector Closures:

  • SB SR 330 Connector to EB SR 210
  • Closed nightly from 9:00 p.m. to 5:00 a.m., Monday, October 4 through Friday, October 8 (into Saturday morning).

  • EB I-10 Connector to WB SR 210
  • Closed nightly from 9:00 p.m. to 5:00 a.m., Monday, October 4 through Friday, October 8 (into Saturday morning).

  • WB I-10 Connector to WB SR 210
  • Closed nightly from 9:00 p.m. to 5:00 a.m., Monday, October 4 through Friday, October 8 (into Saturday morning).

  • EB SR 210 Connector to WB I-10
  • Closed nightly from 9:00 p.m. to 5:00 a.m., Monday, October 4 through Friday, October 8 (into Saturday morning).

  • EB SR 210 Connector to EB I-10
  • Closed nightly from 9:00 p.m. to 5:00 a.m., Monday, October 4 through Friday, October 8 (into Saturday morning).

Ramp Closures:

  • EB SR 210 On-Ramp at Del Rosa Avenue
  • Nightly from 9:00 p.m. to 6:00 a.m., Monday, October 4 through Friday, October 8 (into Saturday morning).

  • EB SR 210 Off-Ramp at Highland Avenue
  • Nightly from 9:00 p.m. to 6:00 a.m., Monday, October 4 through Thursday, October 7 (into Friday morning).

  • WB SR 210 Off-Ramp at Del Rosa Avenue
  • Nightly from 9:00 p.m. to 6:00 a.m., Monday, October 4 through Friday, October 8 (into Saturday morning).

  • WB SR 210 On-Ramp at Highland Avenue
  • Nightly from 9:00 p.m. to 6:00 a.m., Monday, October 4 through Thursday, October 7 (into Friday morning).

  • EB/WB SR 210 Off-Ramps and EB On-Ramp at Base Line
  • Nightly from 9:00 p.m. to 6:00 a.m., Monday, October 4 through Friday, October 8 (into Saturday morning).

  • WB SR 210 On-Ramp at Base Line
  • Nightly from 9:00 p.m. to 6:00 a.m., Monday, October 4 through Saturday, October 9 (into Sunday morning).

Please note, nighttime lane/ramp closures may occur intermittently along EB and WB SR 210, between Del Rosa Avenue and I-10, Mondays through Saturdays (into Sunday mornings), from 8:00 p.m. to 6:00 a.m. No two consecutive ramps will be closed at the same time. In addition, crews will continue daytime and nighttime construction activity along SR 210 as well as on local city streets.
LOCAL STREET CLOSURES
Base Line at SR 210 - Closed nightly from 10:00 p.m. to 6:00 a.m., Monday, October 4 through Friday, October 8 (into Saturday morning). Please note Base Line Street will not be closed at the same time as 5th Street.
5th Street at SR 210 - Closed nightly from 10:00 p.m. to 6:00 a.m., Monday, October 4 through Friday, October 8 (into Saturday morning). Please note 5th Street will not be closed at the same time as Base Line Street.
SOUND WALLS AND RETAINING WALLS
Crews are starting work to construct new sound walls and/or retaining walls throughout the project corridor. This work will take place Mondays through Saturdays during daytime hours (6:00 a.m. to 4:00 p.m.) and intermittently during nighttime hours (9:00 p.m. to 5:00 a.m.). 
 
For more information on sound wall and retaining wall construction, please call (877) 55-SBCTA or email info@goSBCTA.com.
ABOUT THE PROJECT
The SR 210 Lane Addition and Base Line Interchange Project is designed to provide increased traffic flow throughout this corridor. To eliminate the existing bottleneck and provide lane continuity, the SR 210 will be widened from Sterling Avenue to San Bernardino Avenue in the cities of San Bernardino, Highland, and Redlands, as well as an unincorporated portion of San Bernardino County. Base Line Interchange will also be widened from Buckeye Street to Seine Avenue in the City of Highland, which will include widening three of the four interchange ramps. As the SR 210 Lane Addition and Base Line Interchange projects aligned geographically and shared similar delivery schedules, they were combined for the design, right-of-way, and construction phases to save cost and expedite the schedule. In addition, pavement rehabilitation work was added through a cooperative agreement with Caltrans that includes new concrete pavement between 5th Street and Lugonia Avenue. Adding the pavement rehabilitation work during the Lane Addition and Base Line Interchange projects means one less project that the community will have to navigate around in the future.

Please remember construction is dynamic and the schedule is subject to change.
Walking on the freeway is unsafe. In case of an emergency, please dial 9-1-1. For non-emergency Freeway Service Patrol (FSP) services, call the California Highway Patrol (CHP) at (909) 428-5400 or use the nearest Call Box for assistance. Drivers or passengers of a disabled vehicle stopped on a freeway may walk to the nearest exit, in either direction, on the same side of the freeway upon which the vehicle is disabled, or to the nearest Call Box for assistance. For the safety of the public and our crews, unapproved access to construction sites and property related to project construction is prohibited.

Sign up for text messages by texting SR210Baseline to (888) 525-1021 (Reply STOP to cancel, text HELP for help. Normal text and data message rates apply.

Si prefiere recibir información de construcción en español, llame al 877-55-SBCTA.