The concrete pipe production facility in TurnerCo's Lockhart facility has increased. To boost production, TurnerCo installed a reconditioned packerhead pipe machine from Louisiana. The additional plant produces high quality reinforced concrete pipe in sizes 36-inch diameter and smaller in lengths of 8 feet.

This increased capacity at the Lockhart facility complements the high­-volume automated BFS Souver­aen system that produces pipe with diameters ranging from 18 to 60 inches.