Week of 7/13/20
Two road closures begin July 13
SW 103rd Avenue, between Laurel and Kennedy streets, is closed July 13-Aug. 9 for culvert replacement.

The existin g 36-inch culvert is undersized and in poor condition. It will be replaced by a 108-inch by 60-inch reinforced concrete box culvert.

The larger culvert will provide better water flow and allow passage for native migratory fish.

Butner Road  between 126th and Huntington avenues is closed July 13-Aug. 24 for culvert replacement.

Pedestrian and bicycle access will be maintained through the project area. Other travelers must use the signed detour to Murray Boulevard, Walker Road and Cedar Hills Boulevard. Access to St. Andrews Lutheran Church and other properties will be maintained from the east.

Butner Road detour
Public Transit Survey
Comment on potential for public transit service in South Beaverton, Cooper Mountain and Aloha area in the Community Survey.

The survey is a partnership between Washington County, the cities of Beaverton and Tigard, and Ride Connection, Inc. Comment through July 17.
Fanno Creek Trail Crossing at Scholls Ferry Road
Opportunity to review findings of Fanno Creek Trail At-Grade Crossing at Scholls Ferry Road and comment on proposal through July 31.
PROPOSED LAND USE ORDINANCES




Official communications on ordinances must be received in writing or provided at a hearing. Written testimony must include the author(s)' name, address and phone number and may submitted via email, fax, during a hearing or by U.S. Mail: Washington County Long Range Planning, 155 N First Ave., Suite 350, MS14, Hillsboro, OR 97124-3072. Learn more
WC-ROADS HIGHLIGHTS
Road closures
  • 67th Avenue, between Alexander and Genrosa streets, through Aug. 14 for road reconstruction by the city of Hillsboro. Detour map
  • B Street, between Gales Creek and Stringtown Road, through Sept. 30 for bridge replacement. Detour map
  • Blanton Street, between 193rd and 196th avenues, through July 21 for pipeline installation by Clean Water Services. Detour map
  • Cipole Road, between Tualatin-Sherwood and Herman roads, through July 31 for construction by Kerr Contractors. Detour map
  • Elwert/Kruger Road and Sunset Boulevard, between Elwert and Kruger roads and Hwy 99W, closed through July 23 (extended), for construction of the Elwert/Kruger roundabout project. Access closed between Elwert/Kruger roads and Highway 99W. Elwert and Kruger roads will remain open to traffic with lane closures. Detour map
  • Jackson School Road, between Grant and Harewood streets, through Aug. 13 for culvert replacement by the city of Hillsboro.
  • Satsuma Avenue, between Scholls Ferry Road and Shadow Trail Street, through July 20, for installation of the Willamette Water Supply System Scholls Area Pipeline. Detour map
Lane closures
  • First Avenue (OR-219), between Baseline Street (OR-8) and Oak Street (OR-8), 9 p.m. to 5 a.m. Sunday night through Friday morning; 9 p.m. Friday night to 7 a.m. Saturday morning; 9 p.m. Saturday night to 8 a.m. Sunday morning through fall by Oregon Department of Transportation. Map
  • 69th Avenue, at the bridge over Rock Creek, 8:30 a.m.-4 p.m. weekdays intermittently through July 15. Map
  • 198th Avenue, between Farmington Road and Tualatin Valley Highway, 8:30 a.m.-4 p.m. weekdays intermittently through Dec. 31. Map
  • 209th Avenue, at Butternut Creek Parkway/Parker Court, 9 a.m.-3:30 p.m. weekdays intermittently through July 17 by NEI. Map
  • Barnes Road, between Valeria View and Lois Lane, 7 p.m.-5 a.m. through Aug. 14, for road improvements related to the Peterkort Parking Lot project. Map
  • Glencoe Road, between NE Lenox and NE Cory streets, 8 a.m.-4 p.m. through Aug. 14, for road improvements by MEI Moore Excavation Map
  • Jenkins Road, between 158th Avenue and Murray Boulevard, 9 a.m.-3:30 p.m. weekdays through Dec. 31. Map
  • Johnson Street, between Jasmine Place and 178th Avenue, 8:30 a.m.-4 p.m. weekdays through Sept. 8. Map
  • Rosa Road, between 198th Avenue and Farmington Road intermittent lane closures 8:30 a.m.-4 p.m. weekdays through Oct. 30. Map
  • Roy Rogers Road, between Scholls Ferry and Bull Mountain roads, speed reductions for construction through Dec. 31, 2021. Map
  • Scholls Ferry Road eastbound turn lane at Roy Rogers Road closed through July 22, for construction on Roy Rogers Road. Map
NEIGHBORHOOD MEETINGS
Neighborhood meetings, required for many Washington County development applications, can be held online temporarily as per the new COVID-19 Virtual Neighborhood Meeting Supplement. The temporary supplemental policy is in effect for the duration of Gov. Kate Brown's "Stay Home. Save Lives" executive order..
July 14 - Proposed development
At 6 p.m. held virtually ( instructions available here). The property is 2.71 acres in the R-15 District (Residential 12-15 units per acre) and is located at taxlots # 1S107AC01000, # 1S107AC00590, # 1S107AC01200, # 1S107AC01101 and # 1S107AC01100. Contact Wayne Hayson, Pioneer Design Group, at whayson@pd-grp.com.

CPO 6; District 1
July 15 - Proposed 2-parcel partition
At 6 p.m. held virtually ( instructions available here). The property is 0.30 acre in the R-5 District (Residential 4-5 units per acre) and is located at taxlot # 1S125CA08900. Contact Mujib Kamawal at 206-226-2706 or mkamawal@gmail.com.

CPO 4M; District 3
Heather Sturgill | Senior Communication Specialist//PIO

Washington County Department of Land Use & Transportation

1400 SW Walnut St., MS 18 | Hillsboro, OR 97123

503-846-7822 direct | 503-754-1303 mobile