The season is fast approaching so we will be having work sessions Saturdays, generally starting around 9:30 AM. If you or anyone you know can help either join us or send them our way.
Brush sawing the face
Brush Hogging / mowing Main Slope
Final mowing (Push mower and DR) and weed whacking
- bottom lift loading areas
- Around the parking lot
- Along the ATV trail service area
Lift Sign installation
Tube Stop set up then roll up and cover
Install Post pads in tube runout area
Storage Container related
- Side task (need to arrange for return of tent back to parks and rec.)
- Move snow fencing
- Move out rope posts
Fence post repairs
- Need to get 5 split rail fence posts
- one post on tube lift line near mat storage area
- 2 at top of tubing, one near unloading area other in the safety runout area between tube lift and ski slope
- 2 spare (may need for ATV fence)
Flower bed winter prep
- Clean and trim down plants in side entrance flower bed
Install Snow Fence near storage building
Install Post and rope around patio flower bed
Move Popup tent and weights from basement to skate shack
Move Skates from Skate shack to basement area
Move Merchandise racks from skate shack to main floor storage closet
Move snow blower from storage building to basement
Wrap up 220V power cord in groomer building onto spool
Move 480V snowmaking spools to storage container
Lift related
- Apply bar and chain oil to top ski lift tension cable
- Remove Deep cycle batteries from tube lifts and put in storage building
- Collect all lift fire extinguishers to ski lift shack
Other Back ground on tasks of note not a part of regular work session work
Groomer BR350
- Complete main coupler changer over (need to order parts)
- Replace broken cleats (may need to order one)
- Look at installing/replacing ice points
Red Groomer plan is to hoist engine and work on it while hoisted mainly install oil pan and repair Transmission Park lock mechanism then reinstall
Lift related
- Spice handle bracket welding repair (in progress)
- Drain Gear oil from both lifts (will need light gauge sheet metal and bucket) (in progress)
- Repair shaft seals (will not be able to run lifts until repairs are complete)
Snow Gun
- Repair rotator arm (have main parts) need to remove bracket and install bushing and new bolt assembly
- Change oil