I-495 (CAPITAL BELTWAY)
I-495 North
Monday, April 24, through Thursday, April 27, 10 a.m. to 3 p.m.
Single right lane closures on northbound I-495 between Lewinsville Road and George Washington Memorial Parkway for sound wall demolition, jack and bore work, abutment work, and equipment repositioning.
Sunday, April 23 and Monday, April 24, 9:30 p.m. to 5 a.m.
Triple lane closures on northbound I-495 between Lewinsville Road and George Washington Memorial Parkway for lane restriping and realignment to implement traffic shift. Single lane closures will begin at 9:30 p.m. and triple lane closures will begin at 10 p.m. Learn more about the traffic shift here.
Tuesday, April 25, through Saturday, April 29, 11 p.m. to 5 a.m.
Triple left lane closures on northbound I-495 between Lewinsville Road and George
Washington Memorial Parkway for joint repair work. Note: this work is scheduled to
take place nightly through the spring as weather conditions allow.
I-495 South
Monday, April 24, through Thursday, April 27, 9:30 a.m. to 2:30 p.m.
Single right lane closures on southbound I-495 between Lewinsville Road and George Washington Memorial Parkway for sound wall demolition, jack and bore work, abutment work, and equipment repositioning.
Tuesday, April 25 and Wednesday, April 26, 9:30 p.m. to 5 a.m.
Triple lane closures on southbound I-495 between Lewinsville Road and George Washington Memorial Parkway for lane restriping and realignment to implement traffic shift. Single lane closures will begin at 9:30 p.m. and triple lane closures will begin at 10 p.m. Learn more about the traffic shift here.
Monday, April 24, through Friday, April 28, 9:30 a.m. to 2:30 p.m.
Mobile single lane closures on the southbound I-495 collector exit lanes for George Washington Memorial Parkway (Exit 43) and Georgetown Pike (Exit 44) as needed for traffic management.
|