SW 198th Avenue, between Anderson and Jaylee streets, has reopened to through traffic, but construction continues in that area. The road is now at its new elevation, with the exception of the final lift of asphalt paving, which is anticipated for fall 2020.
SW 198th Avenue, between Blanton Street and Farmington Road, has been designated a construction zone.
The posted speed limit has been temporarily reduced to 25 mph. Lane restrictions and other traffic control remain in place. Traffic fines for moving violations in a construction work zone are doubled.
Kerr Contractors continues to install new storm pipe and structures, and complete the testing and acceptance of two new water lines.
Oregon State Bridge, the bridge subcontractor, recently completed bridge decks and end panels. Installation of the sidewalks and pedestrian rails on the new bridges is underway.
Aaken Corporation Electric continues the installation of electrical conduit, related junction boses and the street light pole bases between Jaylee and Southview streets.
PGE continues to work on relocations and transfers south of Jaylee Street. Contractors for Frontier and Comcast are also relocating their facilities south of Jaylee Street.