FaciliWorks CMMS Software
FaciliWorks Express Newsletter 
July 2019    
Reorganize, relabel and recharge your maintenance department with the
FaciliWorks Maintenance Label Kit

 
Create durable, laminated, bar-coded maintenance labels directly out of FaciliWorks CMMS to minimize mistakes and reduce costs. 
 
This compact BrotherĀ® printer (PT-P900W desktop or PT-P950NW network) comes with cables, design software and a full-length label cartridge - everything you need to get started. The P-touch laminated labels are designed and tested for use in harsh-environment applications are available in a variety of sizes and colors. Use this label kit to print highly durable, laminated labels for all of your equipment.  
 
Click here to learn more or contact us today to place your order:  
 
1-800-776-3090
Proper training is a must!  
FaciliWorks Regional Training

To save time, avoid common mistakes and get the most out of your software, it is imperative to receive proper training and we offer a wide variety of training options to meet every need and budget. Class sizes are limited, so make your reservation now!

 
Web Training Suite 
Our Web Training Suite covers the same topics as a regional training class, but it's broken down into four easily manageable online sessions. You can register for individual sessions when you just need a refresher or you can register for the full suite and learn to use FaciliWorks like a pro, right off the bat.
 
Regional Training
Do you prefer to get out of the office? A two-day, hands-on regional training class will take you step by step through planning, preparation, setup and successful operation of FaciliWorks. You'll learn how to save time, avoid common mistakes and get the most out of your software. You'll also learn about advanced topics like data filtering, system maintenance, security and more.
Custom Training
In addition to the two training types listed above, we also offer onsite training and custom web training. If you need to train more than one user, users at multiple locations or simply want a fully customized training experience on your timeline, please contact us regarding these special training options.

 
Contact our training specialist at any time for details or registration:

1-800-777-7020 ext. 134
   
Industry News
How can you move your small to medium-sized office building to "zero energy"?
This industry guide provides a pathway.

A new publication is now available from industry leading organizations to demonstrate to contractors, designers and other facilities professionals that "zero-energy" office buildings are attainable, whether by new construction or by retrofit. Achieving zero energy is defined as a building that, on an annual basis, produces as much renewable energy on-site as it consumes.
Referral Rewards Program
For each referral you make, you'll receive a $100 reward* in the form of a Visa gift card, or if you are unable to accept such gifts, you may choose a discount on a future purchase with us. You can refer anyone to us to earn rewards - even your in-house quality, maintenance and supplier inspection teams.

*Click here for more information and start earning rewards now!
FaciliWorks 8i Tech Tip
Troubleshooting Issues when Creating PMs 
 
If you are unable to manually generate a next PM due, you may have discrepancies in meter values and/or dates. FaciliWorks relies on these values to create the next iteration. So, if the Maintenance Done Date is changed on either a completed PM or on the schedule (from within the Assets -> PM Task tab -> Schedule sub-tab) when the next PM has already been created, then you will run into issues creating another PM.  
 
Navigate to Data Admin -> Assets and find the record with the discrepancy message.  
 
On the Information tab of that record, click the History button, scroll to the bottom of the window to find the last PM completed. In this example, the last Maintenance Done Date is 06/06/2016:
 
Asset History
 
Click the square button to the left of the last PM; the full PM record opens in a separate window. (This is the same screen that appears if you were to navigate to the PM record via Edit PMs.) Click the Schedule tab of the PM record. Make sure that the dates in the screen below match the dates from the History screen above. Sometimes you have to go two records back to validate the dates.  
 
Schedule
 
If you find the dates don't match, go to the Information tab of the PM record, uncheck the Completed Notice checkbox and fix the dates. Then you can complete the record again.

This issue can also be triggered by invalid meter values in a PM, for instance, having a meter value when meter-based schedules are not being used. In the example below (Edit PMs -> Schedule tab), notice that the Maintenance Done Meter has a value of 0. If meter values are not being used, then this field must be empty; otherwise, you're telling FaciliWorks that this value of 0 is correct.
   
 
Meter and Date
 
To remedy this issue, delete the meter values and save the record:  
 
Meter with blank fields
 
To reiterate: the information in the closed PM records must be identical to the information in Data Administration -> Assets -> PM Task.

Remember, you can manually change the Next Date Due, but don't change the Last Maintenance Date after a PM has been completed and the next PM has been created. You can only fix the Last Maintenance Date before the next PM gets created to avoid the date discrepancy.
 
 
We encourage you to explore the additional capabilities of your FaciliWorks software and as always, keep an eye out for future Tech Tips.  
FaciliWorks by CyberMetrics Corporation
1-800-776-3090
Email Us      Visit our Website

Let's Connect