Why was the bike lane on Narcoossee Road eliminated?
The elimination of the bike lane is to allow room for the installation of a low-profile, barrier wall in the median. This wall is necessary to allow crews to safely work on the road during high traffic times. Once the project is completed, the bike lanes on the roadway will be re-established. The new, multi-use trail that begins near Lake Nona Boulevard has been completed and is open for use. The bicyclists friendly components remain and will be added closer to the end of the project.
Why is Narcoossee Road being repaved when the road is being widened?
When the new lanes are completed, the cross slope of the entire road will need to be different. The existing asphalt is being milled and new structural asphalt is being placed at this point in the project to adjust the final cross slope which will allow for proper drainage. This new cross slope will be used to match elevations when the new lanes are constructed and the friction (final) asphalt is placed along the entire project.