July 30, 2021
 
To: GPA Valued Customers
 
Please be advised that storm drain repairs will take place in the CB7 roundabout at Cross Terminal Roadway and Stack 723 on Saturday, July 31 and Sunday, Aug. 1, 2021.

This is the second roundabout when driving east to west from Garden City Terminal to the Mason ICTF empty yard. The left lane (inside lane) of the roundabout will be closed while the drain repairs take place and the right lane (outside lane) will be expanded to safely handle additional traffic.

There will be traffic signs posted to assist with terminal navigation. The roundabout will be fully operational at 6 a.m. on Monday, Aug. 2, 2021.