What to expect at the Snake River Bridge:

  • Temporary traffic signals will be placed on both sides of the bridge to direct traffic.
  • Motorists should expect delays of up to 15 minutes.
  • The speed limit on the bridge will be reduced from 35 mph. to 25 mph.
 
The lane and the speed reductions on the Snake River Bridge will remain in effect until the bridge rebuild is complete.