The Val Vista Transmission Main Rehabilitation project in Phoenix required more than 4,600 linear feet of 90” steel pipe.
The S200 pipe was sliplined into to an existing 96” prestressed concrete cylinder pipeline.
Sliplining benefits include:
• Speed of installation
• Affordability, compared to open trench options
• Reduces traffic and environmental distribution