In addition to the road maintenance projects that are funded by the Ottawa County Road Commission, the list of road paving that is funded through the Township for 2019 includes the following:
“
Prime and Double Chip”
1.
Warner Street from railroad tracks west to 168
th Avenue
2.
Warner Street from US-31 east to 160
th Avenue
Bituminous Asphalt Resurfacing
1.
Coleman Avenue (
Mercury Drive to Robbins Road)
2.
David Avenue (
Robbins Road to Mercury Drive)
3.
Pine Street (
Robbins Road to Mercury Drive)
4.
Ronny Road (
Mercury Drive north to cul-de-sac)
5.
178
th Avenue (
Brucker Street to Comstock Street)
6.
Dewberry Place (
178
th
Avenue west to cul-de-sac)
7.
Shore Acres Road (
178
th
Avenue east to end); and,
8.
Tamerak Lane (
Lakeshore Drive west to cul-de-sac)
All of these paved roadways were rated a “4” on the 10-point PASER scale (
i.e., are at the lower end of “fair”) and total about
2.39 miles for bituminous paving.
The gravel roads that will receive a prime and double chip treatment total about 0.97 miles in length.
Based upon the OCRC bid price, the Township may add additional streets at a later date.