Non-billables on timesheets
-
When determining a job duration, if a non-billable is using clock ins and overlaps a job, the duration will use the clock in for each employee to determine the duration instead of the entire non-billable duration.
File import -
Work areas and kits added to a construction estimate during the import of a DMX file will now be sorted alphabetically.
- When importing a DMX file using IE10, IE11, or Chrome, the Open dialog will be filtered to only show .dmx files; the plant and material imports will also be filtered to show .csv and .txt files.
Proposal options -
Added proposal options to specify which residential contacts are included and whether or not the account name is added above the address for residential accounts. Several options on the construction proposal settings screen have been adjusted for continuity with maintenance and change orders
Replying to tasks -
Replying to a task notification email sent by Manage360 will now default to the email of the person who created the task or added the task set.
Work Orders -
Non-Contract work orders can no longer be billed if they are on an unapproved timesheet. Once the timesheet has been approved an invoice can be created. This is to match the functionality of existing contracted work orders and visits.
Improved route performance -
Improved performance by up to 40% when adding a contract onto a route that already has route occurrences scheduled.
Route details -
The service display name is now shown on the route detail page in the list of contracts in the route as well as the route occurrences tab.
Report load times -
Performance of the following reports has been improved by 2-4x:
- Employee Hours Report
- Job Cost - Detail
- Job Cost - Labor
- Job Profitability Report
- Maintenance Job Cost - Detail
- Maintenance Job Profitability