Remember, as crews begin work on the south balcony, they will first work from top floor to the bottom of the stacks on all ceilings. They will then paint all walls, top to bottom of the stacks. Lastly, they finish with the balcony deck waterproof coating, which will take a few days to cure as it is not simply a paint coating but a waterproof product designed to protect the concrete. Once the waterproof coating is set to begin on the balcony deck, all furniture will need to be pulled inside the unit and the balcony will be locked off. If you need assistance moving furniture off the balcony, please contact Owner Services at (850)563-1017.
 