June 2017 Newsletter
Interstate 69 Bridge Deck Pour 
SIC crew is utilizing our Gomaco 450 Bridge Screed for an early morning concrete pour for Arkansas Highway Transportation Department. 

  • AHTD Resident Engineer - Daniel Courtney
  • AHTD Project Inspector - Brad Hargrave
  • SIC Supervisor - A.J. Donaldson
  • SIC Bridge Supervisor - Michael Archdeacon

  Baton Rouge BioEnergy 
    SIC was contracted to perform immediate aeration trench construction and replacement of perforated aeration trenches throughout the pellet storage dome #1 in Port Allen, Louisiana for Baton Rouge BioEnergy. SIC performed approximately 600 linear feet of hydrodemolition into the existing concrete floor slabs to install new aeration trenches. SIC also replaced all 1,300 linear feet of existing aeration floor grating. The new grating installed by SIC was 5/8" thick X 4' wide X 10' long with 420 aeration slots per sheet. This work was performed on expedited schedule with crews working around the clock. 
  Bruks Truck Dump Installation in Gloster, MS   
SIC utilized our 250 ton crawler crane to pick and set a new truck dump platform for MJ Wood and Bruks Mechanical. SIC was required to walk our American 9310A crane from the Drax log yard through the plant proper to the new Bruks truck dump location during a late evening shutdown in anticipation of equipment truck platform delivery on June 15, 2017. SIC also unloaded a new BMH Reclaim Screw for the new dry shavings silo. SIC placed all associated concrete foundations. 

SIC Crane Supervisor -
Tim Mooney 

Lasalle Biomass 
SIC was contracted to begin recycling and crushing the remaining Louisiana Pacific Plant in Urania, Louisiana. SIC has mobilized to the site our new JCI Crusher. SIC will be crushing this material in preparation for the new concrete log yard construction which will start in Mid-July of 2017. This recycled aggregate material will be utilized as base course beneath the new 15-inch concrete pavement. 

SIC Supervisor - Rodney Ammons
SIC Supervisor - Ronald Donaldson
Mid-South Representative -  John Brown
Morehouse BioEnergy
SIC completed the truck dump and silo foundations for the Dry Shavings and Green Chips Area at Morehouse BioEnergy. SIC is also performing soil cement stabilization, sitework, pile driving, and structural embed fabrication on this project. 

SIC Supervisor -
Jorge Gonzalez 
SIC Asst. Supervisor - Alonzo Murray 
  Amite BioEnergy   
SIC is continuing to place Vibratory Conveyor foundation, Dry Shavings Truck Dump foundations, relocating gas line and underground utilities, and performing sitework for these plant site upgrades.

SIC Supervisor - Jesus Valdez
Drax Representative - Rafael Moreno
Mid South Engineering Representative - Eddie Foshee
Monticello Bypass 
SIC is finalizing the roadway grading backslope and performing proof rolling within the project specification tolerances. SIC anticipates completing all sitework for this 9 mile roadway within the next two months. 

SIC Supervisor - A.J. Donaldson
AHTD Rep - Daniel Courtney


 
Give us a call for your upcoming project needs.

We are a full-service construction firm specializing in:


Site work, drilling & blasting, rock removal

Pile Driving (H-Piles, concrete pilings, auger-cast, drill piers)

Concrete Foundations/Slabs/Structures/Walls/Pits

Concrete Demo/Crushing/Recycling

Mechanical Installation

Crane Services/Rigging (450 tons cranes)

Structural Steel Fabrication/Erection

Pre-engineered metal building erection


Sam Estis
samestis@sicllc.net