Installation:
* Install with nails specified in table.
* Embed 4" into concrete tie beam or masonry bond beam.
*
For Double Anchor installations, the anchors should be installed on opposite sides of wood member and centered in masonry bond beam.
* Designer may specify alternative nailing schedules. Refer to Nail Specification Table in USP Product Catalog for nail shear values. Load values shall not exceed published allowable loads.
* When using alternative nailing schedules, lower most holes in strap shall be filled with nails progressing upwards towards the top of strap.
* Straps may be installed straight and flat against the wood member or wrapped over the roof member to achieve table loads.
* Moisture barrier will be required unless another moisture
remediation method is used.