What's the Difference in these Beams?
These beams were made from the same steel. They will
sell
for
the same price.
But one was processed at a much lower cost.
Beam A
Total Process Time:
119
minutes
All Manual
Shop
Beam B
Total Process Time:
82
minutes
CNC Drill and Saw Shop
Beam C
Total Process Time:
6
minutes
48
seconds
PythonX User
Click Here to Learn More
Realize the time savings and
become the
lowest cost
structural steel fabricator.
www.PythonX.com
905-689-7771
[email protected]