What's the Difference in these Beams? 

These beams were made from the same steel. They will  sell  for 
the same price.  But one was processed at a much lower cost.
Beam A
Total Process Time:

119 minutes

All Manual  Shop
Beam B
Total Process Time:

82 minutes

CNC Drill and Saw Shop
Beam C
Total Process Time:

6 minutes 48 seconds

PythonX User
Realize the time savings and
become the  lowest cost structural steel fabricator.